Thursday, October 26, 2023 – D&B Construction, a construction industry leader in Berks County, is thrilled to announce that our renovation and expansion project for Stratix Systems new headquarters in Wyomissing was awarded building with the Building Berks Award under the “Commercial Offices” category.  This recognition comes from the Greater Reading Chamber Alliance (GRCA) and acknowledges our commitment to excellence in construction and our dedication to preserving the heritage of this historic building.

Stratix Systems, situated in the heart of Wyomissing, marked an ambitious endeavor that involved the complete renovation and expansion of a 79,382 square foot building, giving it new life and purpose. The project was the transformation of the former Wyomissing Knitting Mills Building #5, a structure with a rich history that spans decades. Both Stratix Systems and D&B Construction recognized the significance of preserving the building’s heritage and set out to maintain its integrity and historical value while infusing it with modern amenities and state-of-the-art infrastructure.

As part of the renovation, the project team meticulously removed the entire interior to create a blank canvas for a modern and functional layout. The exterior facade was carefully restored to its framing, achieving a seamless architectural blend between the existing structure and new additions. The renovations also included the addition of a new north lobby entrance, featuring a stunning five-story glass-enclosed staircase, two elevators, and a dedicated service elevator for maneuvering their expansive business systems products.

A key focus of the project was upgrading the building’s infrastructure to meet modern standards, including plumbing, electrical, mechanical, and sprinkler services. This included robust networking capabilities to support the technological requirements of the IT company. The interior design created several open-concept spaces that encourage creativity and productivity, integrating comfortable breakout areas, spacious meeting rooms, and flexible workspaces.

One of the major highlights of this renovation was the transformation of the former low roof area into a magnificent 9,000 square foot office space with soaring 26-foot high ceilings. This not only maximized usable space but also flooded the area with natural light and provided breathtaking views of the surroundings. 

This recognition from the GRCA serves as a testament to D&B Construction’s unwavering commitment to delivering excellence in the field of construction. The transformation of the Stratix building has played an integral role in the broader revitalization efforts of the Greater Reading area, breathing new life into a formerly vacant building, and adding to the allure of the region as it reclaims its historical significance.

We are extremely proud of this recognition. We took an existing building and transformed it from a compartmentalized floor plan into open office areas and functional workspaces while preserving the original design of this historic building. It ties in perfect with the recent redevelopment and revitalization of the former Knitting Mills and Vanity Fair properties.

About D&B Construction:

Founded in 2010 by Dan Gring and Brennan Reichenbach, D&B Construction has grown into one of the region’s most trusted construction firms. Headquartered in Reading, Pennsylvania the company is driven by a commitment to quality and transparency. They have grown from the two founding members to over 50 employees with an additional office outside of Philadelphia to conveniently serve the Delaware Valley region. Today they are a full-service construction management firm offering a variety of services to commercial clients in the healthcare, multi-family, professional office, retail / hospitality, institutional, and industrial sectors. Delivering an individualized, superior experience to all of our clients, D&B is a team of genuinely good people who love to build and work hard, with their success built upon long-standing relationships anchored in honesty, trust, and fairness. Leveraging vast design and build experience, D&B is the conduit for business owners, corporations, and developers looking to enhance the places in which they work, grow, and invest. Completing projects safely, within budget, and on time to minimize any disruption to business is always top priority. For more information, visit online at: dbconstructiongrp.com.

Thursday, October 26, 2023 – D&B Construction Group, a leading commercial construction company, is thrilled to announce that our exceptional work on the Reading Orthodontic Group project has received recognition at the Building Berks Awards, organized by the Greater Reading Chamber Alliance (GRCA). We are honored to have been acknowledged in the category of “Commercial Renovation” for our transformative efforts on this healthcare architectural masterpiece.

The Building Berks Awards, hosted by GRCA, serves as a platform to celebrate innovation, economic growth, and development through construction projects in Greater Reading, Pennsylvania. This recognition for our Reading Orthodontic Group project underscores our unwavering commitment to excellence and our dedication to the communities we serve.

In the heart of Wyomissing, Pennsylvania, the Reading Orthodontic Group building represented a remarkable transformation that redefined the essence of healthcare architecture. A former financial institution was meticulously transformed into a vibrant realm of healing, where modern medical excellence seamlessly blended with architectural innovation. 

The renovation was an orchestration of transformation, with careful deconstruction, reimagination of spaces, and attention to detail. Notable features include a 28-foot-high glass curtain wall at the entryway, natural light flooding the interior, an open ceiling concept, exposed ductwork, suspended lighting fixtures, and acoustic considerations, all contributing to a harmonious and soothing atmosphere.

The Reading Orthodontic Group project has not only set a precedent for transformative architecture but has also become a cornerstone in the Wyomissing community, symbolizing growth, revitalization, and community pride. As patients step into the facility, they experience care, empathy, and innovation in a space that bridges the past with the future.

D&B Construction Group extends its heartfelt appreciation to the Greater Reading Chamber Alliance for this recognition and to our dedicated team for their exceptional work in bringing this transformative project to life. We are committed to continuing to set new standards in construction excellence and innovation in the communities we serve.

We are honored to be recognized by the Greater Reading Chamber Alliance for our work on ROG’s Wyomissing location. This recognition is a testament to the entire team's dedication and unwavering focus on quality. Starting with the owners to the designers and our pre-construction and construction teams, everyone worked tirelessly to deliver this iconic building in the heart of Wyomissing.

About D&B Construction:

Founded in 2010 by Dan Gring and Brennan Reichenbach, D&B Construction has grown into one of the region’s most trusted construction firms. Headquartered in Reading, Pennsylvania the company is driven by a commitment to quality and transparency. They have grown from the two founding members to over 50 employees with an additional office outside of Philadelphia to conveniently serve the Delaware Valley region. Today they are a full-service construction management firm offering a variety of services to commercial clients in the healthcare, multi-family, professional office, retail / hospitality, institutional, and industrial sectors. Delivering an individualized, superior experience to all of our clients, D&B is a team of genuinely good people who love to build and work hard, with their success built upon long-standing relationships anchored in honesty, trust, and fairness. Leveraging vast design and build experience, D&B is the conduit for business owners, corporations, and developers looking to enhance the places in which they work, grow, and invest. Completing projects safely, within budget, and on time to minimize any disruption to business is always top priority. For more information, visit online at: dbconstructiongrp.com.

Doylestown, PA – In a momentous event that marked a significant milestone for Berger Rental Communities, a ribbon-cutting ceremony was held to celebrate the official opening of their newly constructed Butler Square Apartments complex. This elegant addition boasts 50 brand-new residential units, enhancing the allure of the Butler Square property situated at 409 E. Butler Avenue in Doylestown. The ceremony, which took place on Thursday, July 20, gathered a host of community officials, esteemed guests, and members of the development and construction teams.The journey towards this accomplishment began with Berger Rental Communities’ acquisition of the Butler Square property, home to the initial 97 residential units and retail spaces, during the summer of 2021. Spearheading the construction process, D&B Construction played an instrumental role in turning the vision into reality. Our dedication, expertise, and commitment to quality construction were pivotal in bringing forth this luxurious expansion.

The celebration was not limited to those directly involved; members of the community, including current residents of the Butler Square property, attended the ceremony, showcasing the sense of unity fostered by Berger Rental Communities. Council Vice President Mr. John Wolff Jr., representing the New Britain Borough, also graced the event with his presence, highlighting the community’s involvement in this endeavor.

Berger Rental Communities has consistently placed residents at the forefront of their mission, striving to offer comfort, convenience, and cutting-edge features. The new units are thoughtfully designed, with a mix of one and two-bedroom layouts, smart home technology, and designer-inspired finishes. The lobby features a package room for added convenience, while electric vehicle charging stations contribute to the company’s forward-looking approach to sustainable living.

Dan Berger, CEO of the company, emphasized the significance of not only providing housing but also ensuring extreme flexibility and the highest level of customer service for residents. The ribbon-cutting event was followed by a ceremonial groundbreaking, marking the occasion with symbolic importance. Attendees were treated to delectable refreshments from local food trucks.

D&B Construction’s involvement went beyond the construction phase, embodying shared values of care and customer-centricity. Brennan Reichenbach, CFO of D&B Construction, expressed mutual appreciation for the partnership and the shared “we care” mentality. The collaboration between Berger Rental Communities and D&B Construction showcased the powerful synergy of two organizations dedicated to excellence.

As Berger Rental Communities celebrates its 50th anniversary, this achievement symbolizes a year of remarkable growth, with 50 apartment communities now under their management. The luxury apartment complex exemplifies the company’s commitment to blending personalized attention with sophisticated expertise.

In a testament to their commitment to community welfare, the nonprofit Hope & Door, focusing on preventing homelessness through rental assistance, also participated in the ceremony. Their presence underscores Berger Rental Communities’ dedication to giving back and making a positive impact beyond real estate.

The ribbon-cutting ceremony marked the dawn of a new chapter for Berger Rental Communities and the Butler Square property. The luxurious apartment complex stands as a testament to the collaborative spirit of dedicated teams, community officials, and residents united in their pursuit of exceptional living spaces and experiences.


About Berger Rental Communities:

Founded in 1972, Berger Rental Communities has been a multi-family owner and operator for 50 years. At nearly 10,000 apartments, they are one of the top five largest management companies in the state of Pennsylvania, with a portfolio that extends into Maryland and Delaware. Berger is motivated by their philosophy that, “renting shouldn’t be hard®”. Their focus on service, innovation and culture has earned them the number one ranking in multi-family for customer service in the nation, and they are frequently rated amongst the top places to work in their industry. For more information on Berger Rental Communities visit rentberger.com.

 

About D&B Construction:

Founded in 2010 by Dan Gring and Brennan Reichenbach, D&B Construction has grown into one of the region’s most trusted construction firms. Headquartered in Reading, Pennsylvania the company is driven by a commitment to quality and transparency. They have grown from the two founding members to over 50 employees with an additional office outside of Philadelphia to conveniently serve the Delaware Valley region. Today they are a full-service construction management firm offering a variety of services to commercial clients in the healthcare, multi-family, professional office, retail / hospitality, institutional, and industrial sectors. Delivering an individualized, superior experience to all of our clients, D&B is a team of genuinely good people who love to build and work hard, with their success built upon long-standing relationships anchored in honesty, trust, and fairness. Leveraging vast design and build experience, D&B is the conduit for business owners, corporations, and developers looking to enhance the places in which they work, grow, and invest. Completing projects safely, within budget, and on time to minimize any disruption to business is always top priority. For more information, visit online at: dbconstructiongrp.com.

While it may be a timeless running joke that those working in construction are incapable of passing by a location they played a role in constructing without saying “I helped build that,” it also is a testament to all the heart, dedication and grit that goes into the industry.

If you are local to the Wyomissing area, you’ve likely heard – and are excited for – the new lifestyle retail center and outdoor promenade that will be opening this Spring. Leading the build is D&B Construction, a locally based full-service commercial construction company that has been trusted as the General Contractor by Project Developer, Brickstone Realty.

The project team behind the build is the definition of construction that cares. It is composed of a talented design team, D&B’s pre-construction team, D&B’s field team of Superintendents and Project Managers, and nearly 35 qualified companies that D&B trusts as an extension of their team as their Trade Partners. Collectively, they have been working tirelessly to juggle strained lead times, supply issues and more to keep the project running smoothly.

D&B Team Members lead the weekly Trade Partner touchbase meeting at Wyomissing Square to keep the job moving smoothly. Representatives from the following Trade Partners attend: Denny's Electric, HC Quality Doors, RF Power Ventilation Inc., Quality Plumbing Solutions, Security First Inc., and Paramount Contracting.

Team D&B started working with the original plans from 2008/2009, which were “cost prohibitive for the project to work from an economics standpoint,” according to Mark Keever, D&B’s Vice President of Pre-Construction. Mark and his department got to work value engineering the project and running through different design recommendations and ideas courtesy of Project Architect, Tim Cox, President and CEO of Meister-Cox Architects based in Wyomissing. These efforts allowed the project to move forward in a post-COVID world by making it more affordable to construct without losing character and style so the project could be successful for all involved.

“Anytime you are working with a building of that age and size, there will always be challenges and unforeseen conditions. D&B’s Pre-Construction Department, along with the Developers, Design Team and Trade Partners did a deep dive into the required due diligence for a project of this magnitude. Due to the upfront legwork, we were able to head off any major hurdles or obstacles before they arose,” reflects Mark.

Many of the individuals involved in this project have a motivation fueled not only by their dedication to the craft, but their personal ties to the community and love for the area. For D&B Team Member Josh Mazzo, who is also the Project Manager on the job, this rings true. “I grew up in the area, moved away, and came back. There’s something unique about Wyomissing, and to be able to have the opportunity to make physical imprints on the area means a lot. I brag about it to my family and friends. The excitement in my voice will tell you all you need to know,” he explains.

Such is also the case for Project Architect, Tim Cox. As a Wilson High School grad who still lives in the area, it has been “an honor to be part of a project that revitalizes the area, and it is truly humbling to be able to make a small contribution and an indelible mark in the history of Wyomissing.” Similar to how native Berks Countians will always remember the legacy of the Vanity Fair complex, Cox hopes that this transformation of the former Brickstone’s and Viva Bistro and Lounge will also “cement its place into the hearts and history of generations to come.”

 

John Connors, Principal / Master Developer for Brickstone, is confident that the 12 tenants moving into this space will do just that and become “Wyomissing’s living room.” He explains how the intention was always for this to be a first-class best in show lifestyle retail center. “That’s been our plan all along, and that’s what we’re getting. A nice mix of high quality national, regional, and local folks with tenants like Sola Salons and Vintner’s Table by Folino Estate Winery,” states Connors.

To learn more about spaces still available for lease, contact Brickstone Realty directly or reach out through their retail broker, MSC Realty.

From rendering to reality: All images below on the left are renderings courtesy of Tim Cox of Meister-Cox Architects. All images on the right were taken on-site in mid-February showing the progression. You can view more photos throughout construction here on our website.

Choosing Wyomissing:

The developer of this project, Brickstone Realty, has been in the large-scale rehabilitation business for many years in center-city Philadelphia. According to John Connors, when they saw this property – which was not only a very large warehouse building, but also 13 acres in the heart of Wyomissing’s Borough – it looked like a terrific opportunity for them to do a large multi-use project. They wanted to bring high quality retail right into the neighborhood so locals no longer have to get into their car to seek such services out.

“We think it’s going to be an outstanding market, and the response we’re getting now from tenants is really extraordinary. We could have taken shortcuts and filled this place up with Class B tenants, but we basically promised the Borough of Wyomissing something great. We think that this has been an extraordinary development and probably the catalyst for all the other development that’s followed. It’s been successful in every way: 248 apartments upstairs, 135 hotel rooms, another 100 apartments immediately contiguous, The Knitting Mills right next door. We expect this retail to be equally, and maybe even more so, successful. We think the new center of gravity for Wyomissing Borough is going to switch to right here, as we’ve tried to capture the best of everything there is to offer and deliver it right here,” explains Connors.

The Course of Construction:

In the late Summer of 2022, D&B Construction began demolition on this project. The beginning stages involved a lot of lead abatement work and demolition, including excavation and exporting approximately 1.5′ of existing material throughout the 30,000 square foot building footprint in order to lower the subgrade to achieve the desired finished floor elevation. It involved coordinating the removal of approximately 250 tri-axle loads of dirt from the interior of the building.

The construction schedule of this project was an aggressive one, but Team D&B credits each and every one of their Trade Partners for going above and beyond to keep the schedule and maintain the level of product D&B expects. Josh echoes these thoughts, explaining how the D&B team has been “working diligently with our Trade Partners to find ‘work arounds’ until we are able to land the equipment needed, as lead times are a huge issue in today’s world.”

Although it is the first time that Brickstone has worked with D&B Construction, John Connors credits Team D&B for having a good working relationship with the developer and “getting what we wanted to accomplish early on.” Connors explains how D&B and Brickstone have been working hand-in-hand for over 20 months now thanks to “a couple of pandemic-induced fits and starts.”

While no developer enjoys a value-engineering exercise, John Connors believes they were extremists coming out of the pandemic in every respect, so they had to deal with the realities of what the market place was. “I think all in all we worked together to get the best possible result given the conditions of the market place right now. We’re happy with our design. We’re happy with where it’s going. We’re looking forward to opening this place up in the Spring and making a difference in Wyomissing Borough and Berks County,” concludes Connors.

If you drive down Hill Avenue in Wyomissing today, you’ll see storefronts are nearly all installed behind the recognizable navy blue and white fence screening that is D&B’s. This is a pivotal turning point for the project because not only does the installation of all storefronts look nice, but it also allows heat to be kept in the suites so various interior work can be completed. While the exterior is being prepped for more earthwork changes with the promenade and retaining wall, drywall is being finished inside each future tenant’s space so painting can begin and permanent power and heat can be delivered to each unit.

 

 

“We have a good team working on this project – From the Trade Partners, to the owner, to the D&B Project Team. It’s been a team effort the whole way through, and you will want to stick around to see the final product this team can produce,” concludes Josh.

That’s the difference of a construction company that cares.

Stay tuned, Wyomissing. Stay tuned.

Doylestown, PA – On Wednesday, June 8 Berger Rental Communities hosted a groundbreaking ceremony to commemorate construction of an additional 50 new residences at their Butler Square property, located at 409 E. Butler Avenue in Doylestown. The company took ownership of the property, which contains 97 units in the first building with commercial retail space below, in the summer of 2021.

 

Breaking ground from left to right: Matt Johnson, Director of Development; CEO Dan Berger; Wayne Everett Vice President of Acquisition & Asset Management; Brennan Reichenbach, Chief Operating Officer of D&B Construction; and Anne-Marie Niklaus, President of Berger Rental Communities

 

The 50 additional apartments being added to the property will feature new one- and two-bedroom layouts. A package room in the lobby brings added convenience to future residents, and charging stations for electric vehicles will be made available to all residents of Butler Square as the company continues to evolve its communities. Efficiency and modernization are also top of mind inside each apartment, where you will find smart home technology that includes locks and thermostats and designer inspired finishes.

 

 

In attendance for the ceremony were members of Berger’s team, current residences of the Butler Square property, the general contractor, D&B Construction, the project architect, Architectural Concepts, PC, Peaceable Street Capital, and members of the New Britain Borough, including Council Vice President Mr. John Wolff Jr. The company was also grateful to have their nonprofit and relief fund Hope & Door, whose mission is to help families in crisis avoid homelessness through rental assistance, in attendance. “Our goal here is not just to provide housing, but to accommodate residents through extreme flexibility, and provide the highest level of customer service,” said the company’s CEO, Dan Berger. The event concluded with a ground breaking to memorialize the day and delicious refreshments from two local food trucks – Local Harvest Pizza and Sweet Pea Ice Cream.

 

Matt Johnson, Director of Development for Berger Rental Communities, speaks during the ground-breaking ceremony

 

Matt Johnson, Director of Development at Berger, sent his appreciation to the New Britain Borough and D&B Construction during the ceremony, stating: “It truly has been a streamlined process thanks to New Britain Borough. Another great partnership we have is with D&B Construction. When we took ownership of Butler Square it was with the hopes that we could further expand the space and bring more residents to the community. With their help that vision is well on its way to becoming a reality.”

This project comes as the company celebrates their 50th anniversary and a year of a tremendous amount of growth, with 50 apartment communities currently under their belt. According to Wayne Everett, Vice President of Acquisitions and Asset Management at Berger Rental Communities, “Through our growth we have been able to combine the personal touch and the entrepreneurial spirit of a smaller company with the sophistication, expertise, and technology of a larger organization.”

Dan Gring, Chief Executive Officer of D&B Construction, commented on the fact that Berger Rental Communities embodies the same core values as the general contractor: “At D&B we make a conscious effort to partner with those who share our ‘we care’ mentality. This extends from everyone to our clients and employees, to our extended team of trade partners and suppliers. Our main core value is ‘People and relationships matter most.’ Upon meeting the Berger team, we instinctively knew they were an organization centered around people just as we are. Their customer-centric approach easily explains why they continue to rank amongst the top in the nation for customer service in multi-family, and D&B is thrilled to be their partner through this continued growth.”

 

D&B Construction Superintendent, Alex, working on the job site. You can see the existing Butler Square Apartments in the distance.

 

About Berger Rental Communities:

Founded in 1972, Berger Rental Communities has been a multi-family owner and operator for 50 years. At nearly 10,000 apartments, they are one of the top five largest management companies in the state of Pennsylvania, with a portfolio that extends into Maryland and Delaware. Berger is motivated by their philosophy that, “renting shouldn’t be hard®”. Their focus on service, innovation and culture has earned them the number one ranking in multi-family for customer service in the nation, and they are frequently rated amongst the top places to work in their industry. For more information on Berger Rental Communities visit rentberger.com.

 

About D&B Construction:

Founded in 2010 by Dan Gring and Brennan Reichenbach, D&B Construction has grown into one of the region’s most trusted construction firms. Headquartered in Reading, Pennsylvania the company is driven by a commitment to quality and transparency. They have grown from the two founding members to over 50 employees with an additional office outside of Philadelphia to conveniently serve the Delaware Valley region. Today they are a full-service construction management firm offering a variety of services to commercial clients in the healthcare, multi-family, professional office, retail / hospitality, institutional, and industrial sectors. Delivering an individualized, superior experience to all of our clients, D&B is a team of genuinely good people who love to build and work hard, with their success built upon long-standing relationships anchored in honesty, trust, and fairness. Leveraging vast design and build experience, D&B is the conduit for business owners, corporations, and developers looking to enhance the places in which they work, grow, and invest. Completing projects safely, within budget, and on time to minimize any disruption to business is always top priority. For more information, visit online at: dbconstructiongrp.com.

“Tenant fit out” is a common phrase you will hear used throughout the industry. It refers to the process of making an interior space ready for occupation. Usually, it is common practice in commercial construction to keep the interior space empty so occupants can create the look and feel of their business while determining the level of refurbishment they need. While an office renovation refers to the work needing done to improve an interior design (think aesthetic revamps such as purchasing new furniture or fresh paint), a fit out involves creating a usable area within an empty space.

The Different Types of Commercial Fit-Outs

A Category A fit out is the standard for what you will find in commercial space ready for renting, with utilities such as plumbing fixtures and electrical wiring already in place. Typically, features like electrical outlets, HVAC systems, fire protection systems, raised access floors and toilets would need to be installed yet.

On the other hand, a Category B fit out requires installing features that are lacking in a Category A. In sum, this fit out focuses on making the aesthetic design specific to the business. It typically involves installing lighting, flooring, painting, partitioning, window treatments, furniture, and branding to make the office yours.

 

 

A core and shell fit out refers to a space that already has the framework of the building in place and is ready to be custom fit to its specifications. These fit outs typically include the following tasks:

-Floor installation

-Partition walls

-Ceilings

-Power and Lighting

-Painting

-Furnishings and fixtures (such as casework and millwork)

-Changes or updates that may be needed for structural elements of the space, such as the placement of windows and doors

-Updates that may be needed to HVAC (such as extending into other spaces with ductwork and controls), Electric, Sprinkler systems, etc.

-Cabling and wiring for internet connectivity and communication arrangements (fire alarms and other protection systems)

 

What to Consider When Contemplating an Office Fit-Out for Your Business:

Fitting out an office space for your organization is a big undertaking that – when done correctly – can have a lasting impact for many years to come. It all starts in the pre-construction phase, where the proper planning and design of your space will ensure a smooth project throughout the duration of construction. Here are a few things to consider:

-An office fit out is an organization’s opportunity to take a blank canvas and make it their own. Consider how you can organize your space to increase workflow and enhance your staff’s performance. Do this by evaluating how the workspace will be used and all that needs to be in it for your team to efficiently complete their jobs.

-Plan for the future. If you ask yourself questions like “How will my business / industry grow and change over the next few years?” and “Will the proposed space be able to accommodate expansion in the future?” you can avoid needing to make renovations sooner than you’d like. As a result, your organization will save money by avoiding having to interrupt business to make changes to your office space.

-Make flexibility top of mind. Consider how technology advances and new trends may impact your office’s workflow. Does your space have the flexibility to adapt to such rapid change?

 

The Right General Contractor Makes all the Difference:

Most importantly, make sure the people you surround yourself with during this process are reliable, organized, and great communicators. A good General Contractor will help you navigate all of the points listed above.

D&B Construction Superintendent, Joseph, is no stranger to Tenant Improvements, regularly completing fit-outs for our clients like Cardiology Consultants of Philadelphia. He shares some tips on what to look for in the right GC for the job:

-Your GC should provide a dedicated project team to oversee your fit out. In order to make sure the job runs as smoothly and efficiently as possible, your GC should lead the project team in meticulously going over your project’s logistics and specifications in pre-construction. This may include working with your property management team, building architects and engineers, and other tenants in your building.

-Look for a conscientious GC who is actively working out and updating schedule details to limit any type of disruption or inconvenience to your current operations. A constant open line of communication and attention to detail ensures your project is completed on time.

-Weekly client meetings organized by the contractor of your fit out are a good way to ensure you are always fully aware of your project’s progress. Regular touch bases also enable the team to target any changes that you may want to make during the course of construction.

-A good GC will have a well-established relationship and open line of communication with their subcontractors. At D&B, our team works hand in hand with our trade partners to achieve perfection on your project. Our high standard of cleanliness, safety, and quality of work shows through the duration of the project.

 

 

“The bottom line comes down to this,” explains Joe: “When the project is completed the client should feel like we exceeded their expectations of the finished product. Starting with the pre-construction team and ending with the final cleaning of the project, we take extreme pride in the work we deliver, as well as the relationships formed with our clients. This makes all the difference.”

 

A transitional photo showing the before and after shots throughout one of our many medical office fit outs

for our client, Bucks County Orthopedic Specialists.

Wyomissing, PA – On Monday, May 9, Stratix Systems and D&B Construction held a topping off ceremony to commemorate the completion of the fifth floor of Stratix Systems’ new corporate headquarters at 200 North Park Road, Wyomissing. This 80,000 SF building, which is currently receiving extensive exterior and interior renovations, was part of the original Wyomissing Industries. View coverage from the event here!

Learn more about the details and history of this adaptive reuse project here on our blog.

“Topping Off” is a long-standing tradition among construction workers that commemorates the completion of the building’s structure as the final steel beam is placed. In attendance for the topping off ceremony were building owner and future tenant, Stratix Systems, the general contractor, D&B Construction, the project architect, RHJ Associates, the Project Engineer, Martarano Engineering, Inc., the Structural Engineer, Structure Labs, LLC, and the steel trade partner, United Weld Services LLC.

 

President of Stratix Systems, Brent Simone, signs the final beam before it is placed by our steel partner United Weld Services LLC during the topping off ceremony on Monday, May 9

 

Members of Martarano Engineering, Inc. sign the beam during the topping off ceremony

 

Our trusted Trade Partner United Weld Services LLC prepares to lift up the final beam to complete the fifth floor of this 80,000 SF building!

 

The final beam in route to be placed at the top of the building

 

United Weld Services LLC doing what they do best!

 

Dan Gring, Chief Executive Officer of D&B Construction, commented on the importance of high-end commercial office renovations such as this one: “Adaptive reuse projects like the Stratix Systems corporate headquarters are important because they revitalize historic buildings, creating a stronger future in the community. We’re thrilled to lead the project team.”

According to Brent Simone, Stratix Systems president, “We think it’s important for us to reinvest in our community. In fact, we’re committed to that philosophy. That’s why we chose the former Wyomissing Industries property. Not only is it a gorgeous building, one with a significant history for Wyomissing and Berks County, it gives us the size and flexibility to accommodate our growth for many years to come.”

 

A proud moment for everyone involved

 

Members of both Team D&B and Stratix Systems watch the last beam getting placed

 

The Simone family poses with our Chief Operating Officer, Brennan Reichenbach, and our Chief Executive Officer, Daniel Gring

 

From left to right: Wilson School District Internship Coordinator, Stefanie Wagner, Senior Honors Intern Savanna, Jake Peterson, and Ramon Marquez, Assistant Principal for Wilson

 

From left to right: Chief Executive Officer of D&B Construction Group Daniel Gring, President of Stratix Systems Brent Simone, and Chief Operating Officer of D&B Construction Group Brennan Reichenbach

 

The Simone family at the topping off ceremony

 

About Stratix Systems:

Stratix Systems is one of the region’s leading technology solutions partners. With a history that spans nearly 50 years, more than 130 IT professionals, and offices in Wyomissing, Bethlehem, King of Prussia and York, Pennsylvania, as well as Edison, New Jersey — it’s no wonder why Stratix Systems is the partner of choice for over 6,500 organizations throughout Pennsylvania and New Jersey. Very few providers in the country can match the vast array of technology solutions and responsive service available from Stratix Systems. Whatever a client’s technology needs — Managed IT Services, Cybersecurity, Imaging & Printing Solutions or Document Management, Stratix Systems has the people, the technologies, the expertise and the experience to deliver the advanced solutions and support clients rely on. Stratix Systems has earned recognition as a member of the prestigious Inc. 5000, as well as recognition as one of the fastest growing companies from both Lehigh Valley Business and the Greater Reading Chamber Alliance. The company has also been recognized by Ricoh USA with Ricoh’s Circle of Excellence designation and Ricoh USA’s President’s Award. Stratix Systems has repeatedly earned certification as a Pros Elite 100 dealer – the only Pros Elite 100 dealer in the region – a certification that recognizes the top-shelf achievement and client service of the top 100 service organizations in the country. Learn more at www.stratixsystems.com.

 

About D&B Construction:

Founded in 2010 by Dan Gring and Brennan Reichenbach, D&B Construction has grown into one of the region’s most trusted construction firms. Headquartered in Reading, Pennsylvania the company is driven by a commitment to quality and transparency. They have grown from the two founding members to over 50 employees with an additional office outside of Philadelphia to conveniently serve the Delaware Valley region. Today they are a full-service construction management firm offering a variety of services to commercial clients in the healthcare, multi-family, professional office, retail / hospitality, institutional, and industrial sectors. Delivering an individualized, superior experience to all of our clients, D&B is a team of genuinely good people who love to build and work hard, with their success built upon long-standing relationships anchored in honesty, trust, and fairness. Leveraging vast design and build experience, D&B is the conduit for business owners, corporations, and developers looking to enhance the places in which they work, grow, and invest. Completing projects safely, within budget, and on time to minimize any disruption to business is always top priority. For more information, visit online at: dbconstructiongrp.com.

 

Just over a year ago, D&B Construction began demolition of the exterior and interior of an 80,000 SF building in the heart of Wyomissing, PA. The culmination of this design-build core and shell project will reveal a completely renovated building offering five stories of high-end commercial office space. The building will be home to the headquarters of Stratix Systems, a leading technology solutions partner that is rooted in Wyomissing. Three floors totaling 45,000 SF of space will be fit out for Stratix Systems and two floors totaling 30,000 SF will be available for future tenants.

 

Rendering provided by the project’s architect RHJ Associates, P.C.

 

Some highlights of this project include:

-Asbestos abatement and lead paint removal

-The removal of all interior furnishings, finishes, partition walls, and MEP’s to make way for all new floor configurations and finishes specific to Stratix’s wishes and providing clear space for future tenants

-Removal of sprinkler and fire alarm systems to allow for all new NFPA 13 sprinkler systems, including a new fire pump and fire alarm systems

-Removal of existing exterior insulation finish system and aluminum windows made way for an upgraded EIFS and enlarged aluminum windows restored to their original size.

-Removal of the entire roofing system and entrance vestibules / porticos to make way for a completely new roof system, as well as a five-story storefront entrance with stairs and two passenger elevators

-A freight elevator and loading docks are also being added to the building, while the fifth floor receives an expansion

-Given the intricacies of this project and the fact that safety is our standard at D&B, a full site specific safety plan was created and implemented for this project, including bi-weekly JSA/JHA, weekly site meetings, confined space training and regularly scheduled scaffold inspections.

 

A view of the scaffolding on the side of the building

 

Stepping Back in Time to the Building’s Original Pioneers:

Like many adaptive reuse projects, this building comes with a rich history:

 

 

Blueprints from the 1954 addition of the building.

 

The building was part of the original Wyomissing Industries, a multi-faceted manufacturing enterprise founded by Ferdinand Thun and Henry Janssen in 1906 when they incorporated their three main businesses: the Textile Machine Works (soon to be the future home of Stratix Systems), Narrow Fabric Company (braided products), and the largest full-fashioned knitting mill in the world, the Berkshire Knitting Mills (hosiery and fabrics).

 

In 1969, following the decline of nylon, the nation’s first outlet center was purchased by VF Corporation. The VF Outlet had six million visiting shoppers annual during its peak, and in 1991 Reading was officially declared “The Outlet Capital of the World.” Today UGI Energy Services’ headquarters, Teleflex, and Tower Health System’s collaboration with Drexel University’s College of Medicine Branch, along with updated restaurant and retail offerings, can be found at the new Knitting Mills that locals and visitors alike have come to know and love.

 

Adaptive Reuse: A Delicate Balance of Preserving A Building While Paving the Way for the Future

In addition to D&B employees and the project architect, RHJ Associates, approximately 45 of our dedicated Trade Partners, made up of both individuals and entire organizations, have been collectively working to revitalize this space. One such Trade Partner is Pullman Services, who was on site for about four months completing a variety of tasks involving structural repairs to the existing building and installing temporary lintels so more windows could be cut into the building façade. As part of their structural repairs, Pullman restored deteriorated concrete on over 50 columns and girders in the original portion of the building. Their Foreman, Jamie, referred to the project as a unique job. “I’ve never seen columns built like this in my 20 years in the industry,” he explained.

Some of the Trade Partners on this project have multiple contracts from demolition into core and shell. Once all is said and done, approximately 45,000 man hours will have been spent completing this project between over 100 individuals, ranging from Project Manager to laborer.

 

Some other key players in the building’s transformation include the following Trade Partners:

EHC Associates completed both interior and exterior demolition, as well as asbestos abatement and lead paint stabilization.

Paramount Contracting has completed framing and various exterior work, such as the exterior insulation finishing system. (Learn more about our partnership with them here!)

Shea Roofing is installing the new roof and aluminum clad panels as part of the new exterior finish system

United Weld Services LLC is erecting steel, which expanded the fifth-floor roof over 26 feet and will be integral in the new entrance lobby

B&G Glass is installing new windows throughout the building

Michael C Wall is completing all HVAC work

H.B. Frazer Company is heading up the electrical work

Haller Enterprises, Inc. is leading the plumbing work

 

Anyone that frequently drives over the bridge on Park Road headed towards the Knitting Mills has undoubtedly received a first row look at the transformation taking place on the building’s exterior. For those not from the area, here’s a look at the transformation:

 

March 2021 – Prior to start of the exterior demolition

 

 

 

Our trade partner EHC working on exterior demo of the building in Spring of 2021. The old EIFS system over the building was removed to reveal the building’s original brick.

 

By late summer of 2021, new framing is added to the building and windows are restored to their original size. Framing was modified to allow for these new windows, as well as the new exterior insulation finishing systems. The EIFS that was on the building was installed in 1989.

Here you can see many layers to the new Master Wall EIFS. The green you see is the exterior gypsum sheathing attached to the exterior wall framing. The yellow / orange portion of the building is the Master Wall roller shield air and vapor barrier system. According to our Senior Project Manager, Dave Moyer, this new system is beneficial from an energy standpoint, as it is air and vapor tight.

 

The white you see being added here is 1.5” of foam. This serves as insulation to the building. (Photo taken mid-November 2021)

 

After the foam was applied and rasped with sanding tools, the next step was to start troweling the finish base coat, which is the gray you see on the front of the building in the picture above and in the photo below.

B&G Glass installs the new aluminum windows in mid-March of this year.

 

A recent progress shot from April 12, 2022. You can see the five-story elevator shaft being built from the bridge.

 

What’s Next on the Schedule for Stratix:

Once the new exterior insulation finish system is complete, we will then begin to stencil the brick. The stenciled brick will nicely compliment the other buildings of the Knitting Mills across the street. Here are some photos from a mock up that was completed last August by Paramount Contracting Inc. to give you an idea of what the final exterior will look like:

 

D&B Construction also looks forward to hosting our first topping off ceremony to commemorate the completion of the steel work for this building in May.  “This long-standing tradition of construction workers commemorates the completion of the buildings structure as the final beam is placed,” explains Chief Executive Officer of D&B Construction, Dan Gring. “We are happy and excited to be part of projects such as this one that will revitalize such a vital, historic building. The fact that our first topping off ceremony just so happens to be in the hometown of where it all began for our company, where many of our team members not only work but live, is just the icing on the cake. It’s a true honor,” he states.

Skip to content